Sunday, March 23, 2008

Spring Break 2008!!!

Friday before Break Material Strength Testing with Brad:

1. Putting up a dam:

2.Clearing out rocks


3. Level #1 completed filling dirt for level #2

-messy site


City of Clemson gave JT the keys to the bobcat:)

3. Last level...wishing we still had the keys to the bobcat
4. YAY bobcat!!!! We were really tired by Friday afternoon and it was a big help

-finally getting the tiers flat
5. Last day finishing up with rocks and flattening the soil


Clemson Elementary Week 2

Floor Plans:
Key Points in the Lesson:
1. Circulation
2.Public Space (guest space)
3. Private Space(family space)
4. Frank Llyod Wright


Presenting their dream floor plans:








Clemson Elementary Week 1

Pipe Cleaner Gates:







Finished Gates:


Class Photo:









canopy mock-up 03/09-03/15

-assembling the canopy, row #1 of 27
-assembly continues

-beginning to hang the canopy in two pieces
-still hanging

-the canopy continues to go up
-connecting the top ring
-COMPLETED!!!!